Use these instructions when installing storeWALL V-Brackets (E-SVB6) to mount freedomRAIL products to storeWALL or other slatwall products.
NOTE: We highly recommend adding a second pair of brackets to Go-Lockers, Drawer Units, Bench Supporting units, or other units that will be heavily loaded. The second pair should be mounted to the bottom half of the cabinet where spacing allows after the below instructions are followed. Simply attach to the storeWALL panel and then slide the bracket to the side of the cabinet panel and attach with screws.